KitLog pro

Powered By Kitlog Pro v2.0

John B.s Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-29-2010
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Moving to airport

Today is moving day for the fuselage.Brad Reak and Bob Eggelston came over to my house to help with the moving. I hired a fellow who meved Brad's airplane by the name of Tanner (970-566-3710). He came out with a 48' trailer that more than accomodated the length of the fuselage, however, the width was just enough for the main landing gears. The ramp was just enough to roll the airplane up to the truck. Had to use a few plywood pieces to help where the ramp cables were attached. Overall everything went pretty smoothly. I decided not to count the time spent with moving and shop setup since this is not part of the construction process. Because I have to enter in the software the hours worked I just engter 0.1 hour with all these activities.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.