Installed all the front bulkhead components and made adjustments until every part fit together. Drilled 1/2" holes in the front bulkheads for the platenuts that are installed in the lower cowling air inlet side (fasten the lower and upper colwings at the air inlet). Later I might cut out this area of the left and right front bulkheads.