Drill out rivets installed by VANS before shipping quick bult fuselage in preparation of installing top forward skin. Re-check pitot lines for leaks. Found just minor leaks less than 5 knots per minute. Previous problem was actually coused by the lines and connectors we used for the test. Bob Eggelston helped me with this process (2 men is a must).