KitLog pro

Powered By Kitlog Pro v2.0

John B.s Web Site
' style=
Date:  7-3-2005
Number of Hours:  1.00
Manual Reference:  DWG OP 15
Brief Description:  Mapbox

Cleco together the two mapbox halves a rivet as per plan. This probably would have been a lot easier if the plans called for blind rivets and I am sure it would have been just as strong. One very minor dent from a slipped rivet gun at the back of the box.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.