Powered By Kitlog Pro v2.0
John B.s Web Site
RV-9A
All
8-19-2008
< Previous Log Entry
Next Log Entry >
Date:
8-19-2008
Number of Hours:
2.00
Manual Reference:
Brief Description:
GRT EIS
Decided to move the Grand Rapids Avionics Engine Information System control box to the middle panel. To palce it on the right would have been to far from the pilot seat. I cut the square hole as per GRT specs and also drilled the hole for the light.
Avionics5
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
1347
2941
Avionics
207
496
Canopy
50
145
Cowling
29
70
Electrical
18
49
Empennage
35
60
Engine
119
248
FilteredAirBox
7
17
Firewall Forward
68
152
Fuselage
464
944
Hardware
3
4
Labels
6
10
Miscellaneous
46
103
Paperwork
2
0
Prop
1
2
Seat belt
3
8
Wings
289
633
Copyright © 2001-2024 Matronics. All Rights Reserved.