KitLog pro

Powered By Kitlog Pro v2.0

John B.s Web Site
' style=
Date:  5-16-2005
Number of Hours:  2.00
Manual Reference:  
Brief Description:  F-751 Lower Baggage Bulkhead Inspection

Mark the rivet hole locations on the inspection panel assembly and drill the holes. Deburred and counter sunk all the rivet holes. Prime the assembly pieces.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.