Date:
9-24-2004
Number of Hours:
3.00
Manual Reference:
DWG 38
Brief Description:
Control Column
Install control column/stick assembly as per drawing 38. Very time consuming mostly because of washers and re--checking 49 19/32 length for F-989 elevator pushrod. Check for free movement of control assembly.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
1347
2941
Avionics
207
496
Canopy
50
145
Cowling
29
70
Electrical
18
49
Empennage
35
60
Engine
119
248
FilteredAirBox
7
17
Firewall Forward
68
152
Fuselage
464
944
Hardware
3
4
Labels
6
10
Miscellaneous
46
103
Paperwork
2
0
Prop
1
2
Seat belt
3
8
Wings
289
633
Copyright © 2001-2024 Matronics. All Rights Reserved.