KitLog pro

Powered By Kitlog Pro v2.0

John B.s Web Site
' style=
Date:  1-9-2003
Number of Hours:  5.00
Manual Reference:  6-3
Brief Description:  Vertical Stabilizer

Cleco the VS-808PP spar doubler to the VS-803PP rear spar, then cleco on the 3 hinge brackets. Back drill the six hole pattern through the upper VS-410PP.Prepare the 4 ribs (debur, flute). Cleco the ribs to the front and back spars. Final drill #30 the rear spar and rear spar doubler, the hinge brackets and rib to spar attach holes. Cleco the VS-801PP skin to the skeleton.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.