KitLog pro

Powered By Kitlog Pro v2.0

John B.s Web Site
' style=
Date:  12-13-2011
Number of Hours:  2.20
Manual Reference:  
Brief Description:  Strobe and fuel level connectors

Installed the heat shrink tubes on the strobe wires. Install connectors. This time it works solid. Pulled fuel level wires (left and right) through fuel tube hole to the fuel level connectors. Protect wires from possible chaffing. Started working at the wing tips. Install left wing tip strobe connector.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.