KitLog pro

Powered By Kitlog Pro v2.0

John B.s Web Site
' style=
Date:  9-17-2012
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Drill out rivets

Drill out rivets installed by VANS before shipping quick bult fuselage in preparation of installing top forward skin. Re-check pitot lines for leaks. Found just minor leaks less than 5 knots per minute. Previous problem was actually coused by the lines and connectors we used for the test. Bob Eggelston helped me with this process (2 men is a must).
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.