Deburred stick and the stainless steel links. Than primer and top coat was applied to stick. After drying stick was connected to cables with kit AN3 bolts, washers, castelnuts and cotterpins. Stick mounted to torque tube with AN3-16 bolt double washers and castlenut. Holes for bracket 6-B-15-51 in central frame 6-B-12-1 was drilled in wrong position, should be on right side but are drilled on the left.