KitLog pro

Powered By Kitlog Pro v2.0

SVEN-AKE'S WEB SITE
' style=
Date:  6-16-2016
Number of Hours:  6.00
Manual Reference:  Chapt 14
Brief Description:  left wing installation

I picke up the rented trailer for transport to hangar. Similar as on right wing.
Grrommets installed in side skin for fuelline and plastic tubes for strobe and fuelsensor wires.
A push-on fitting and fuelhose fit for return fuel. Cable supports riveted to skin.
6 NAS6205 bolts installed with washers and locknuts at wingspar. At rear wingspar one AN5-06 bolt with 2 washers and a locknut. Torqued to 18Nm.
Flap was riveted before wing installation.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.