KitLog pro

Powered By Kitlog Pro v2.0

SVEN-AKE'S WEB SITE
' style=
Date:  5-9-2016
Number of Hours:  6.00
Manual Reference:  Kit 2&3
Brief Description:  transport to ESGO

Finally I was ready to leave my garage for a hangar at ESGO, Vårgårda.
A trailer wide enought was not possible to find. But to temporary move mainwheels to inside spring solved transport problems.
Before transport stabilizer and rudder was reinstalled again, outside garagedoor. Too small opening.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.