KitLog pro

Powered By Kitlog Pro v2.0

SVEN-AKE'S WEB SITE
' style=
Date:  3-28-2016
Number of Hours:  8.00
Manual Reference:  Kit 2&3
Brief Description:  cowling

Now hinges has arrived. A lot of testing starts to confirm position of side hinges.
Side skins and doubler marked, and cut. Hinges attached with clecos. Cut to 400 mm.
Horisontal hinges placed on upper/lower cowling, to start with a minimum of clecos. I could not follow the already cut line, the hinge pin get stucked and can´t be moved.
Now hinge points down in front end, and pin can be withdrawn as supposed.
Reason, horisontal cut does not correspond to center of propeller-hub opening. And shape of upper cowling is not ideal, it´s more flat than sides.
Sidehinge to fuselage, riveted with countersunk1/8" rivets.
I used 5/32" rivets for all others, big domed head to fiberglass feels safer.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.