Installed aileron-cables 6-B-22-51 and -22-52. Connect them to bellcrank with AN3-06 bolts AN960-3 washers and castlenuts DAN-3, via links SC128. I fabricated a bushing 8mm OD, 5mm ID and 6 mm long to get a stiffer installation of wire to bellcrank. Now it is possible to torq AN3 bolt/nut combination. Installed than cotterpins. Next step was to prepare lower skin, deburr and primer. Even reinforcement angle 6-W-8-52 is now primered.