KitLog pro

Powered By Kitlog Pro v2.0

SVEN-AKE'S WEB SITE
' style=
Date:  10-29-2014
Number of Hours:  2.00
Manual Reference:  chapt 10
Brief Description:  nose gear leg

After primer and painting nosegear leg 6-G-1-1, upper part was adjusted to fit inside plastic bearing. Wiyh leg in right position, movement was marked up and some paint has to be removed from the sliding surfaces. Bungee 94510010 and spring pin 6-G-2-2 installed, and then lower bearing was reinstalled and torqued again to 5Nm. Bungee spanned in position, and cotter pin 91CI3030 installed. Assembled top plate SF327-4 with bolts 91UA0616A and 2 washers. Installed stopper SS049 with long bolt, washers and stopnut.
Continue with steering rods 6-G-2-4L+R, double washers and cotterpins at pedals. Double washers and stopnuts at gear leg. Torqued to 16Nm.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.