KitLog pro

Powered By Kitlog Pro v2.0

SVEN-AKE'S WEB SITE
' style=
Date:  8-5-2014
Number of Hours:  2.00
Manual Reference:  chapt 9
Brief Description:  flap torq tube

Prepared bearings for torque tube, deburr and primer.
Rivet 6-B-19-5, -19-51 and -19-50 with extra long 4 mm rivets.
After some cutting inside plastic bearing, it was possible for axle to slip in.
Installed both bearings with AN3-05A bolts, washer and locknuts. Torqued to 5 Nm.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.