July 16-18. Removed doubler 6-B-13-4 on right side and bent it for a better fit. Installed it again. Turned fuselage with right side down and start riveting bottom skin. A lot of rivets..... Installed lower rudder hingle and torqued the AN3 bolts to 6 Nm. All tasks up to page 11 are done now.