KitLog pro

Powered By Kitlog Pro v2.0

Brocks RV-7A
' style=
Date:  10-29-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Main Bulkhead Work

After a short lunch break, I continued working on the fuselage. I began assembly of the forward and aft main bulkheads. I installed all platenuts and gromets. I then fabricated the control arm attachments and drilled, deburred, and bolted them to the spar. I also drilled and deburred the holes for the majority of the bulkhead.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.