KitLog pro

Powered By Kitlog Pro v2.0

Brocks RV-7A
' style=
Date:  4-7-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Rolling the Leading Edge

After rolling the edge the hard way on the rudder, today I purchased the pipe and J bolts needed to roll the leading edge the easy way. I then rolled the leading edges and cleco'd them in place. I then final drilled all holes and applied blind rivets to the leading edge. The leading edge came out great!
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.