After a short lunch break, I continued working on the fuselage. I began assembly of the forward and aft main bulkheads. I installed all platenuts and gromets. I then fabricated the control arm attachments and drilled, deburred, and bolted them to the spar. I also drilled and deburred the holes for the majority of the bulkhead.