Powered By Kitlog Pro v2.0
NATHAN'S WEB SITE
RV8
All
1-12-2008
< Previous Log Entry
Next Log Entry >
Date:
1-12-2008
Number of Hours:
3.00
Manual Reference:
Pg. 8-19
Brief Description:
Landing Gear
I drilled the holes in the U-804s and U-806s. Next time I could do it in 1/4th the time. This thinking thing really takes a lot of time! I made the F-635B Spacer for the F-635 Bellcrank Assembly and assembled it and match drilled it.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
177
417
Empennage
74
198
Fuselage
44
105
Miscellaneous
4
9
Shop Supplies
1
4
Tools
4
8
Wings
50
93
Copyright © 2001-2024 Matronics. All Rights Reserved.