KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  11-29-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Testing begins

Verified propeller tracking.

With a fully cowled engine, plane taxied to compass rose.

Static RPM checked.

G3X magnatometer calibration and Engine run up tests passed.

Did a 33 KIAS taxi test on way back. Started to get nose wheel shimmy at this speed.

Drained fuel tanks in preperation for W&B.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.