Brief Description: Drilled and clecoed aft baggage bin
Tonight was one of those nights that I was exhausted from work and barely able to drag myself down to the shop. However, a few minutes of classical music on the radio and the sound of the drill snapped me out of it. I was able to finish fabricating the baggage bin parts and then drill them to the airframe. I also drilled on the aft baggage bin bulkhead. Next, I will have to debur all of the holes and prep for priming and painting. After that, I will install all of the nutplates that hold the upper bin parts on the airframe. Nothing gets riveted until much later in the construction.