Brief Description: Drilled the bars to the 811 bulkhead: HUH?
Tonight, I worked on the 811 bulkhead by drilling the supporting bars to the bulkhead as shown in the plans. Since the bulkheads are predrilled, I back drilled the bars to the bulkhead. After I had finished, however, I saw that one of the holes is too close to the edge. Drawing 27A does not seem to jive with drawing 22. I stopped everything and sent an e-mail, with pictures, to Vans to see what the deal is.