KitLog pro

Powered By Kitlog Pro v2.0

Stevens Web Site
' style=
Date:  11-12-2006
Number of Hours:  2.90
Manual Reference:  
Brief Description:  Finished 807 Bulkhead

Today I finished the 807 Bulkhead (the one that goes just behind the rear passenger) by drilling, deburring, dimpling, priming and riveting all of the pieces together. I had to study the plans very carefully to determine how the reinforcement doubler for the boarding step assembly was to fit onto the bulkhead. The drawings are a little misleading in one place, but the doubler goes on in such a way that the flange points away from the flange on the bulkhead. I was able to squeeze all of the rivets, making it a relatively easy job.
' style=

Drilling the 807 Bulkhead

Drilling the 807 Bulkhead

' style=

Reinforcement doubler for the boarding step assembly (to go on much later)

Reinforcement doubler for the boarding step assembly (to go on much later)

' style=

Setting the rivets in the 807 Bulkhead with the pneumatic rivet squeezer

Setting the rivets in the 807 Bulkhead with the pneumatic rivet squeezer

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.