Powered By Kitlog Pro v2.0
Stevens Web Site
RV-8A
All
9-14-2008
< Previous Log Entry
Next Log Entry >
Date:
9-14-2008
Number of Hours:
2.20
Manual Reference:
Brief Description:
Fabricated and installed fuel pump brackets
Today I fabricated the two bracket assemblies that hold the high pressure fuel pump. Then, I painted them and pop riveted them to the cockpit floor.
Fuel injection pump clamped to the brackets I fabbed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8A Home
Category
# Logs
# Hours
All
491
1502
Empennage
55
137
Finishing Kit
14
48
Fuselage
254
921
Prop
1
Shop Improvements
2
Wings
165
396
Copyright © 2001-2024 Matronics. All Rights Reserved.