Date:  10-26-2017
Number of Hours:  9.00
Manual Reference:  FAB box
Brief Description:  Completing loose ends

I haven't been too diligent about log entries this past week. Part of the reason, is that there hasn't been much to report.

I have worked on the airplane every day for the past week, doing little odds and ends necessary to move to the next major phase - Baffle installation.

Tied in the mix and fuel cables to FI Servo. Tied in cable for FAB air bypass (firewall fitting was a pain in the ass). Final fit air filter - very tight and satisfying. Remounted the exhause - another pleasing thing that didn't take too long.


The FAB box and air bypass was a sizable pain in the ass. The cowling was off and on about 100 times. However it is done, all the levers work. Everything has full paths of clear travel. The FAB air intake mates really well with the cowling air intake scoop.

All said, I'm pretty happy with this week's progress.