Powered By Kitlog Pro v2.0
Steven's RV-9A
RV-9A
All
10-16-2017
< Previous Log Entry
Next Log Entry >
Date:
10-16-2017
Number of Hours:
6.00
Manual Reference:
FAB
Brief Description:
Finishing FAB and cowling
Finishing up the FAB. Attached gasket. Got a good molded edge to connecting he cowling and FAB.
Trying to fill cowling surfaces (inside and out), Rolled on 2 coats of thinned epoxy on the outside, and a single coat on the inside.
Everything is coming together. Felt like the project got a little stalled on the cowling. It is good to move on to the baffles.
I have to do the oil access door and then I can move onto the baffles.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
200
1014
Avionics
12
54
Empennage
2
16
Engine
22
116
Fuselage
86
367
Miscellaneous
62
356
None
1
12
Shop Supplies
2
20
Wings
13
73
Copyright © 2001-2024 Matronics. All Rights Reserved.