KitLog pro

Powered By Kitlog Pro v2.0

Steven's RV-9A
' style=
Date:  10-16-2017
Number of Hours:  6.00
Manual Reference:  FAB
Brief Description:  Finishing FAB and cowling

Finishing up the FAB. Attached gasket. Got a good molded edge to connecting he cowling and FAB.

Trying to fill cowling surfaces (inside and out), Rolled on 2 coats of thinned epoxy on the outside, and a single coat on the inside.

Everything is coming together. Felt like the project got a little stalled on the cowling. It is good to move on to the baffles.

I have to do the oil access door and then I can move onto the baffles.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.