Brief Description: Drilling the vertical stabilizer
Clecoed the VS-808PP spar doubler to the VS-803PP rear spar. Clecoed the hinge brackets VS-410PP, VS-411PP, and VS-412PP. Back drilled the six-hole pattern through the upper VS-41-PP. Prepare the and fluted the VS-704, VS-705, VS-706 and VS-707 ribs. Clecoed the ribs to the front and rear spars. Final drilled #30 size in the VS-808PP, VS-410PP, VS-411PP, and VS-412PP to VS-803PP holes. Drilled #30 all rib to spar attachment holes.