KitLog pro

Powered By Kitlog Pro v2.0

Stevens RV7 N617R
' style=
Date:  3-31-2006
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Started match drilling

Well, I drilled my first holes today. That was a good feeling. Robert Cutter who is building a RV4 was there to help me celebrate, along with James Clark. James has built a RV6 and is working on a 7A right now. Ken Harrill who is my technical adviser came over from his hanger and gave me his blessing. Ken built a slow build RV 6. It's amazing how many times you check to make sure you have the right size bit.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.