KitLog pro

Powered By Kitlog Pro v2.0

Steve's RV-7 Site
' style=
Date:  7-4-2006
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Finished the left fuel tank!

Primed the leading edge replacement rib (inner most rib - I screwed up when I drilled the holes the first time!) along with the fuel tank attach brackets and the fuel tank attach strip. Then... I took a deep breath and dove in. Prosealed the fuel tank baffle and riveted that sucker together. With the exception of installing the inspection plate... the fuel tank is done!!! I'll put the inspection plate on and then pressure test it later this week... hopefully no leaks...
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.