Brief Description: Started assembly of left elevator
- Made DB9 connector for elevator trim wires. - Hooked up trim servo switch and indicator and tested for proper operation. It works! - Made wood blocks for bending left elevator trim tabs. - Bent left elevator trim tabs. - Started assembling left elevator skeleton.