Powered By Kitlog Pro v2.0
Randy's 750 Cruzer Project
CH750 Cruzer
Fuselage
6-21-2020
< Previous Log Entry
Next Log Entry >
Date:
6-21-2020
Number of Hours:
2.00
Manual Reference:
C75-FA-3
Brief Description:
Drilled L brackets and riveted to baggage floor
Drilled and installed the L brackets on the baggage floor. Fitted baggage floor in fuselage. Cut and riveted the short L brackets that go on the sides of the floor.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH750 Cruzer Home
Category
# Logs
# Hours
All
300
804
Controls
24
46
Elevator
18
44
Engine
1
1
Firewall
10
22
Fuel System
17
48
Fuselage
94
236
Horizontal Stablizer
24
63
Landing Gear
7
14
Miscellaneous
2
7
None
4
5
Rudder
1
7
Vertical Stabilizer
7
14
Wings
91
297
Copyright © 2001-2024 Matronics. All Rights Reserved.