KitLog pro

Powered By Kitlog Pro v2.0

Randy's 750 Cruzer Project
' style=
Date:  4-5-2020
Number of Hours:  2.00
Manual Reference:  C75-FA-2
Brief Description:  Began riveting longerons to top skin

While the top skin was on the fuselage transferred thetop longerons to the top skin. Removed the top skin and longerons from the fusaelage.
I began riveting the longerons to the top skin. Discovered that a couple of the diagonal L brackets on the top skin were too long and stuck between the longeron and top skin. I had to remove some of the rivets in one longeron and remove the L brackets from the top skin.
Was frustrated that I did not catch that before I began riveting. Will correct on another day.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.