KitLog pro

Powered By Kitlog Pro v2.0

Todd’s RV14a
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-4-2019
Number of Hours:  12.00
Manual Reference:  13-02
Brief Description:  Right Wing Build

Began right wing build.

Steps 1-5. Fabd the J channel as called out in the steps. Matched drilled the j channels.

13-03 Final drilled the spar flange. Machine countersunk the nutplate holes. All looks good.

Step 3. Machine counter sunk the flange locations not already done.

Step 4. Riveted the fuel tank skin nutplates into place.

Riveted the wing access nutplates.. Spot primed where the countersinking was done.

Installed snap bushings.

13-05. Steps 1-3. Final drilled the web rivet holes and installed nutplates.

STep 4. Final drilled the #12 holes in aileron bracket and attached to spar with bolts.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.