Began building thhe outboard leading edge. Adjusted all the flanges of the ribs and deburred. Final drilled #40 and #30 as called out. Modified the 2 W-1009-L ribs. Notched them to fit up agains the spar for install. Buffed the Notched leading edges of the ribs to fit nicely inside the skin. Fabricated the J channel. Installed and match drilled. Removed the splice strip from the fuel tank skin.
17-04. Clecoed all the ribs and J channel into place. Match drilled the ribs as called out. Deburred all parts. Primed all with self etching primer.
Dimpled leading edge skins.
17-05
Dimpled all the holes in the back plates, light mount plate, splice strip and access doubler. Installed nut plates in all per plans. Rivet access doubler onto skin. Nice.