Completed steps 1-8 for the aft deck. This is very beefy and strong. Squeezed most of the rivets except for I couldn't reach then bucked them. Primed all parts of course with etching primer from sem.
10-28. Temporarily installed the vertical so as to match drill and final to #12
10-29. Step 1 broke all the edges of the F1475 top skin Dimpled all the holes. Dimpled the 1475A skin doubler and J stiffener. Riveted the upper aft fuse rib to the skin doubler and J stiffener.
10-30. Dimpled all the holes on the 1474 L/R skins. Primed with self etching primer from sem. Clecoed into place and riveted per 10-31. Back riveted.
10-32. Installed and riveted top skin 1475. Backriveted.
All looks exceptional.
All the work on the fuselage was inspected for workmanship and any defects up to chapter 10-32 by Don Sortland A&P 2841579. No defects or redos found.