KitLog pro

Powered By Kitlog Pro v2.0

Todd’s RV14a
' style=
Date:  6-2-2019
Number of Hours:  10.00
Manual Reference:  17-03
Brief Description:  Right Leading edge build

Began right wing buildup.Step 1 Buffed the edges of all the leading edges as required.

Step 2. Deburred all the holes in the ribs and dimpled

Fabricated the J stiffeners as required and drilled up to the skin

Fitted all the ribs to the skin as called out and drilled up to #40. Deburred all then primed.

Fabbed a new landing light mount. Will pick that up later in the build

17-06. Riveted the ribs to the skin as shown. Very nice


Everything up to this point was inspected by the great and honorable Don "bulldog" sortland. All looks good AP 2841579
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.