KitLog pro

Powered By Kitlog Pro v2.0

Todd’s RV14a
' style=
Date:  3-24-2019
Number of Hours:  8.00
Manual Reference:  17-03
Brief Description:  Begin Leading edge build

Began building thhe outboard leading edge. Adjusted all the flanges of the ribs and deburred. Final drilled #40 and #30 as called out. Modified the 2 W-1009-L ribs. Notched them to fit up agains the spar for install. Buffed the Notched leading edges of the ribs to fit nicely inside the skin. Fabricated the J channel. Installed and match drilled. Removed the splice strip from the fuel tank skin.

17-04. Clecoed all the ribs and J channel into place. Match drilled the ribs as called out. Deburred all parts. Primed all with self etching primer.

Dimpled leading edge skins.

17-05

Dimpled all the holes in the back plates, light mount plate, splice strip and access doubler.
Installed nut plates in all per plans. Rivet access doubler onto skin. Nice.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.