KitLog pro

Powered By Kitlog Pro v2.0

Todd’s RV14a
' style=
Date:  1-18-2019
Number of Hours:  6.00
Manual Reference:  14-03
Brief Description:  Left wing buildup

Step 1. Straightened flap hinge brackets and deburred. Primed area where it will be sandwiched with spacer. Clecod and match drilled #30 as required.

Step 3-4. Removed all existing hardware for rib attach from spar and saved.Final drilled #30 and 40 after temporarily attaching ribs to spar. Removed then deburrred.


14-04. Step 1. Drilled #19 ground lug on w-1010L rib.


Step 2-3. Used step drill to enlarge system holes in all ribs. Installed snap bushings.

Deburred and primed all parts with SEM etching primer.

14-06. Assembled the inboard/outboard flap hinge assy and riveted together. Also the torque tube support assy was riveted as required.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.