KitLog pro

Powered By Kitlog Pro v2.0

Todd’s RV14a
' style=
Date:  12-1-2018
Number of Hours:  4.00
Manual Reference:  11-05
Brief Description:  Horizontal and vertical Attach

11-05 Attached Horizontal to fuselage.

11-06. Step 1 Final drilled 1/4 all the holes in the aft spar to the F`1411 bulkhead. Installed Vertical VS1402 onto the horizontal and bolted.

11-07 Skipped for now. Wiring.

11-08. Temporarily installed Vertical stab for steps1-3. Installed rod ends per step 3 and torqued. Did not require any adjustments. Installed rudder per 11-09. Fitment was good. Checked rudder degrees and rudder stop. Deflection was within specs.

11-10, Skipped rudder cable install for now until end.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.