KitLog pro

Powered By Kitlog Pro v2.0

Thatcher CX-5 Build Log
' style=
Date:  12-1-2019
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Aileron Controls

Got the aileron controls for both sticks connected to the longitudinal aileron torque tube. Also mapped out my upcoming task list.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.