KitLog pro

Powered By Kitlog Pro v2.0

Thatcher CX-5 Build Log
' style=
Date:  7-28-2019
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Elevator Control Linkages

Managed to get the elevtor control links installed from the F7 bulkhead back to the horizontal stab mount, just forward of F12. Temps of 105 today, so that was less than fun. I dropped some additional bits of cromoly tubing at the machinist I have welding the control rod ends. Apparently he burned through a couple, and will need the spare metal to try again. Hopefully I'll get the control rods back by the end of the week.

And now, I'm off to sleep.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.