Thatcher CX-5 Build Log
|
Date: 5-25-2019
|
Number of Hours: 7.50
|
Manual Reference:
|
Brief Description: Controls and Starboard Stringer
|
|
Today was pretty productive. I got the starboard F7 and port F6 bulkheads cut out, formed, primed, and installed. The starboard stringer has been cut, primed, and installed. The elevator control linkage between the front and rear seats has been cut, tapped, primed, set with bearings, and installed. The pictures below show the temporary run of the portside rudder cable path, mocked up with paracord. And I've started on the rear seat footrests and the F7 port bulkhead. Hopefully I'll get those done tomorrow, along with the portside stringer.
It's starting to look like an aircraft fuselage and not just a skeleton.
|
|
|
|
|
|
|
|
|
|
|
|
|