KitLog pro

Powered By Kitlog Pro v2.0

Thatcher CX-5 Build Log
' style=
Date:  5-31-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fuselage Sides Assembled

This looks like vastly more progress than it actually is. The upper and lower longerons are assembled into left and right sides, very carefully rigged square. But in these pictures, the firewall is just set in place, resting on the longerons. I couldn't resist, becuase for the first time it's starting to look a little bit like an aircraft.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.