KitLog pro

Powered By Kitlog Pro v2.0

Thatcher CX-5 Build Log
' style=
Date:  11-24-2019
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Port Brakes and Control Rods

Completed the port side brakes, filled, bled, and tested. Tried out some fitment changes, and reversed one of the screw/nut assemblies on the rudder pedals to get better clearance from master cylinder fittings.

Also got the control rods drilled out for the stops and control sticks, and got everything epoxy coated. Once they dry I will be able to assemble them.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.