Powered By Kitlog Pro v2.0
Thatcher CX-5 Build Log
CX5
All
5-23-2019
< Previous Log Entry
Next Log Entry >
Date:
5-23-2019
Number of Hours:
2.00
Manual Reference:
Brief Description:
Bulkheads and Controls, Cont'd Cont'd
Got the left rudder pedal assembled with the extension, tested the controls runs aft, and built, Zinc phosphated, and cleco'd the F6 Starboard bulkhead. Go team.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CX5 Home
Category
# Logs
# Hours
All
160
1173
Avionics
11
50
Empennage
2
24
Engine
3
36
Fuselage
120
933
Miscellaneous
4
9
None
1
Shop Supplies
4
34
Wings
15
87
Copyright © 2001-2024 Matronics. All Rights Reserved.