Attached the spar to the front of the fuselage. The rivet pattern interfers with the brackets, so a couple had to be drilled out to allow the spar to be flush and plumb. Also, the confluence of boltheads and nuts in a two square inch area at the base of F5 is unfortunate. There was a ludicrous amount of removing and reattaching that needed to be done here.