KitLog pro

Powered By Kitlog Pro v2.0

Thatcher CX-5 Build Log
' style=
Date:  6-25-2018
Number of Hours:  14.00
Manual Reference:  
Brief Description:  Bulkheads F2 and F4

Somewhat obviously, this is 14 hours over the course of the weekend. I cut the MDF formers for bulkheads F2 and F4, and attached 1:1 drawings of the bulkheads to the appropriate 6061 sheets. The bulkheads were cut out, then the control pass throughs were cut out. The first F2 bulkhead had the pass-though cut out by drilling a series of 3/32" holes around the perimeter of the cut-out, then cutting away the pass through. This yielded an incredible amount of grinding to get a finished surface. Hours later, I decided to not use that technique again.

The second F2 bulkhead, I decided to use a Dremel with a cut-off wheel. This was slighly better, but consumed a rediculous number of cut-off wheels.

The F4 bulkheads were cut out with step-bits, and the Dremel used to releive the straight cuts between the drilled holes. This is, apparently, the right way to cut out those losenge shaped holes. This took about one-quarter the time, and one-eighth the number of cut-off wheels.

The only flaws in the plan werea couple of minor cuts on my fingers from the bulkhead spinning when the step bit caught. I had it clamped down, but I only used one clamp and neglected to wear my gloves. Note to my future self; always wear gloves when working with the step bit, and always clamp the bukhead in TWO places.
' style=

View Forward from Spar

View Forward from Spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.